This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
craft_software_skill [2013/10/31 23:23] storyteller [SOFTWARE CRAFTING TIME] |
craft_software_skill [2021/12/04 00:39] (current) |
||
---|---|---|---|
Line 8: | Line 8: | ||
All you need is skill and a computer system with a PL equal to or greater than the PL of the software. | All you need is skill and a computer system with a PL equal to or greater than the PL of the software. | ||
+ | |||
And time, often lots of time. | And time, often lots of time. | ||
Line 13: | Line 14: | ||
===== WRITING SOFTWARE ===== | ===== WRITING SOFTWARE ===== | ||
- | A large list of available software can be found [[Robots and ai|here]]. The software descriptions note a purchase DC as well as restriction level. | + | A large list of available software can be found [[|here]]. The software descriptions note a purchase DC as well as restriction level. |
The Software Crafting Time chart shows the time required to write a program, based on its Craft DC. When necessary, always round up. Once the required time has been spent on crafting a program, the creator rolls a Craft (software) check against the Crafting DC. On a failed roll, the crafter must spend additional time as though the program’s DC were one higher, then roll again. If the Craft check is failed by 5 or more, the program is fatally flawed and the crafter must begin again from scratch. | The Software Crafting Time chart shows the time required to write a program, based on its Craft DC. When necessary, always round up. Once the required time has been spent on crafting a program, the creator rolls a Craft (software) check against the Crafting DC. On a failed roll, the crafter must spend additional time as though the program’s DC were one higher, then roll again. If the Craft check is failed by 5 or more, the program is fatally flawed and the crafter must begin again from scratch. |